Project name

Description

 Location

Status

Mechanical upgrades for 61 Charles

Installed humidification systems on the air distribution system at 61 Charles

61 Charles Street Building

Completed March 2016

IT infrastructure upgrades

Installed standby generator (20-kilowatt) to maintain IT infrastructure

61 Charles Street Building

Completed October 2015

IT infrastructure upgrades

Installed standby generator (10-kilowatt) to maintain IT infrastructure

Bordessa Hall (55 Bond Street East)

Completed October 2015

Renovations to the second floor of St. Gregory's School

Converted the second floor of St. Gregory's School (leased by UOIT) into Kinesiology research space (dry lab) for two to three faculty members

St. Gregory's School

Completed September 2015

New offices for the Faculty of Engineering and Applied Science

Created offices in lobby of ACE on second, third and fourth floors

ACE

Completed July 2015

Renovation of House 22

Renovated the unoccupied space at House 22 at Windfields Farm lands into functional office space

Windfields Farm lands

Completed June 2015

Science Building Lab Renovations

Creation of six new research labs and renovations to six existing labs.

Science Building

Completed 2014

Renovations to ACE

Creation of new research lab.

ACE

Completed 2014

Interlock repairs

Grade alterations to pavers and retaining wall.

Bordessa Hall/Regent Theatre

Completed 2014

Lift installation

Installation of accessible lift from the ground floor to second floor, mezzanine level.

Regent Theatre

Completed 2014

Washroom upgrades

Renovation of existing men's washroom and creation of new accessible unisex washroom.

Regent Theatre

Completed 2014

Psychology renovations

Renovations to create new teaching spaces and meeting rooms.

2 Simcoe Street South

Completed 2014

Student Life renovations

Renovations to existing Student Life workspace

U5 Building

Completed July 2014

Student Experience Test Centre

Renovations to existing space

61 Charles Street Building

Completed July 2014

Retail store

Renovations to create UOIT retail store

61 Charles Street Building

Completed April 2014

Digital Media Lab

Relocate existing Digital Media Lab

Relocated from 2 Simcoe Street South to 61 Charles Street Building

Completed April 2014

Occupancy sensors

Retrofit classrooms and large open spaces with occupancy sensors

61 Charles Street Building, Bordessa Hall and Education Building

Completed April 2014

UOIT-Baagwating Indigenous Student Centre

Completion of 167 square-metre (1,800 square-foot) new building

 151 Athol Street